



A £1.5 million joint Venture with Hulme Upright Limited Architects practice to refurbish the existing training facility. This included:-
The Heat source for the hot water to the new changing & shower extension was the revolutionary Dimplex air source heat pump. This is probably the first air source heat pump installation as a heat source for heating hot water within the UK.